18.4.101   ADMINISTRATION OF ENGINEERING DIVISION RULES

This rule has been repealed.

History: 2-4-103, 2-4-201, 2-4-202, MCA; IMP, 2-4-103, 2-4-201, 2-4-202, MCA; Eff. 12/31/72; REP, 2018 MAR p. 1599, Eff. 8/11/18.

18.4.110   DEFINITIONS

For the purposes of this subchapter, and unless the context expressly indicates otherwise:

(1) "Department" means the Montana Department of Transportation.

(2) "Electronic bid submission" means a bid submitted via an electronic process established by the department by which bidders submit proposals or bids for contracts using a secure bid service provider selected by the department.

 

History: 30-18-118, 60-2-201, MCA; IMP, 30-18-104, 30-18-107, 30-18-109, 30-18-113, 30-18-114, 30-18-116, 30-18-117, 60-2-112, 60-2-113, 60-2-114, 60-2-201, MCA; NEW, 2004 MAR p. 2915, Eff. 12/3/04; AMD, 2007 MAR p. 1445, Eff. 10/1/07; AMD, 2018 MAR p. 1599, Eff. 8/11/18.

18.4.111   SUBMISSION OF TRANSPORTATION CONSTRUCTION BID

(1) Except as stated in (4), a person must submit a transportation construction bid to the department using an electronic bid and the electronic bid submission process established by the department.

(2) The bid must be submitted to the department by the date and time specified in the notice of bid or other similar document.

(3) Technical difficulties in accessing or posting to the department's bid service do not excuse late electronic bid submission.

(4) The department may accept a non-electronic bid submission for specific projects as designated in the notice of bid or contract special provisions. The bidder is solely responsible for ensuring a non-electronic bid submission is received by the department by the due date and time.

 

History: 30-18-118, 60-2-201, MCA; IMP, 30-18-104, 30-18-107, 30-18-109, 30-18-113, 30-18-114, 30-18-116, 30-18-117, 60-2-112, 60-2-113, 60-2-114, 60-2-201, MCA; NEW, 2004 MAR p. 2915, Eff. 12/3/04; AMD, 2007 MAR p. 1445, Eff. 10/1/07; AMD, 2018 MAR p. 1599, Eff. 8/11/18.

18.4.112   ELECTRONIC BID SUBMISSION

(1) In order for an electronic bid to be deemed properly submitted, the bid must contain all information required in the bid package and a digital signature.

(2) A bidder must be authorized by the department before submission of electronic bids.

(3) A bidder must use the secure electronic bid service selected by the department.

History: 30-18-118, 60-2-201, MCA; IMP, 30-18-104, 30-18-107, 30-18-109, 30-18-113, 30-18-114, 30-18-116, 30-18-117, 60-2-112, 60-2-113, 60-2-114, 60-2-201, MCA; NEW, 2004 MAR p. 2915, Eff. 12/3/04; AMD, 2007 MAR p. 1445, Eff. 10/1/07; AMD, 2018 MAR p. 1599, Eff. 8/11/18.

18.4.113   ACCEPTABLE TECHNOLOGY

This rule has been repealed.

History: 30-18-118, MCA; IMP, 30-18-104, 30-18-107, 30-18-109, 30-18-113, 30-18-114, 30-18-116, 30-18-117, MCA; NEW, 2004 MAR p. 2915, Eff. 12/3/04; AMD, 2007 MAR p. 1445, Eff. 10/1/07; REP, 2018 MAR p. 1599, Eff. 8/11/18.

18.4.114   PRIVATE AND PUBLIC KEYS

This rule has been repealed.

History: 30-18-118, MCA; IMP, 30-18-104, 30-18-107, 30-18-109, 30-18-113, 30-18-114, 30-18-116, 30-18-117, MCA; NEW, 2004 MAR p. 2915, Eff. 12/3/04; AMD, 2007 MAR p. 1445, Eff. 10/1/07; REP, 2018 MAR p. 1599, Eff. 8/11/18.

18.4.115   VERIFICATION

This rule has been repealed.

History: 30-18-118, MCA; IMP, 30-18-104, 30-18-107, 30-18-109, 30-18-113, 30-18-114, 30-18-116, 30-18-117, MCA; NEW, 2004 MAR p. 2915, Eff. 12/3/04; AMD, 2007 MAR p. 1445, Eff. 10/1/07; REP, 2018 MAR p. 1599, Eff. 8/11/18.

18.4.201   ALTERNATIVE CONTRACT PROJECT DELIVERY METHODS

(1)�Construction manager general contractor experience will not be a required scoring criteria for highway construction projects.

(2) �The department must weight the in-person interview of each shortlisted proposer as at least half of the technical score. �The technical proposal will account for the balance of the technical score.