HOME    SEARCH    ABOUT US    CONTACT US    HELP   
           
Rule: 18.5.112 Prev     Up     Next    
Rule Title: DESIGN REQUIREMENTS
Add to My Favorites
Add to Favorites
Department: TRANSPORTATION
Chapter: PRECONSTRUCTION BUREAU
Subchapter: Highway Approaches
 
Latest version of the adopted rule presented in Administrative Rules of Montana (ARM):

Printer Friendly Version

18.5.112    DESIGN REQUIREMENTS

(1) The permittee shall furnish all materials necessary for the construction of the approaches and appurtenances authorized by the permit. This shall include drainage pipe, curb and gutter, concrete sidewalks, topsoil or sod, etc., as required. All materials, including base and surfacing, shall be of satisfactory quality and shall be subject to inspection and approval by the department.

(2) It shall be the responsibility of the permittee to supply, place, and properly compact the approach fill and base material in accordance with department requirements.

(3) Drainage in highway ditches shall not be altered or impeded except as authorized and approved by the department.

History: 60-2-201, MCA; IMP, 60-2-201, 60-5-101, 60-5-104, 60-5-105, MCA; NEW, 1983 MAR p. 991, Eff. 7/29/83; AMD, 2013 MAR p. 1442, Eff. 8/9/13.


 

 
MAR Notices Effective From Effective To History Notes
18-143 8/9/2013 Current History: 60-2-201, MCA; IMP, 60-2-201, 60-5-101, 60-5-104, 60-5-105, MCA; NEW, 1983 MAR p. 991, Eff. 7/29/83; AMD, 2013 MAR p. 1442, Eff. 8/9/13.
7/29/1983 8/9/2013 History: 60-2-201 MCA; IMP, Sec. 60-2-201 MCA; NEW, 1983 MAR p. 991, Eff. 7/29/83.
Home  |   Search  |   About Us  |   Contact Us  |   Help  |   Disclaimer  |   Privacy & Security