HOME    SEARCH    ABOUT US    CONTACT US    HELP   
           
Rule: 24.301.719 Prev     Up     Next    
Rule Title: ASSIGNMENT OF STATE IDENTIFICATION NUMBER
Add to My Favorites
Add to Favorites
Department: LABOR AND INDUSTRY
Chapter: BUILDING CODES
Subchapter: Boiler Safety
 
Latest version of the adopted rule presented in Administrative Rules of Montana (ARM):

Printer Friendly Version

24.301.719    ASSIGNMENT OF STATE IDENTIFICATION NUMBER

(1) At the time of the initial boiler inspection, the state boiler inspector will assign and apply to the boiler a state identification number as directed by the department.

(2) Each steel boiler will be stamped by the inspector, utilizing letters and figures not less than 5/16" in height and arranged as follows: MTB 00000.

(3) Each cast iron boiler will be marked with a permanent marker in two locations and arranged as follows: MTB 00000.

(4) State identification numbers applied to boilers shall be maintained so as to be legible. When a boiler's state identification number becomes indistinct, the department will require the original number to be reapplied.

History: 50-60-203, 50-74-101, MCA; IMP, 50-60-203, 50-74-102, 50-74-206, MCA; NEW, 1996 MAR p. 420, Eff. 2/9/96; TRANS, from Commerce, 2001 MAR p. 2301; AMD, 2013 MAR p. 52, Eff. 1/18/13.


 

 
MAR Notices Effective From Effective To History Notes
24-301-268 1/18/2013 Current History: 50-60-203, 50-74-101, MCA; IMP, 50-60-203, 50-74-102, 50-74-206, MCA; NEW, 1996 MAR p. 420, Eff. 2/9/96; TRANS, from Commerce, 2001 MAR p. 2301; AMD, 2013 MAR p. 52, Eff. 1/18/13.
2/9/1996 1/18/2013 History: 50-60-203, 50-74-101, MCA; IMP, 50-60-203, 50-74-102, 50-74-206, MCA; NEW, 1996 MAR p. 420, Eff. 2/9/96; TRANS, from Commerce, 2001 MAR p. 2301.
Home  |   Search  |   About Us  |   Contact Us  |   Help  |   Disclaimer  |   Privacy & Security