36.14.504    BREACH OR REMOVAL OF AN EARTH DAM

(1) The breach of an earth dam must be excavated down to the level of the natural ground and be able to pass the 100-year, 24-hour flood at a depth and velocity equivalent to the natural channel. However, the maximum width required may be the total removal of the dam.

(2) The sides of the breach must be excavated to a slope that is stable and consistent with the natural angle of repose of adjacent material abutting the dam or as determined by the engineer.

History: 85-15-110, MCA; IMP, 85-15-210, 85-15-213, MCA; NEW, 1988 MAR p. 2489, Eff. 11/24/88.


 

 
MAR Notices Effective From Effective To History Notes
11/24/1988 Current History: 85-15-110, MCA; IMP, 85-15-210, 85-15-213, MCA; NEW, 1988 MAR p. 2489, Eff. 11/24/88.
Home  |   Search  |   About Us  |   Contact Us  |   Help  |   Disclaimer  |   Privacy & Security