HOME    SEARCH    ABOUT US    CONTACT US    HELP   
           
Rule: 36.15.903 Prev     Up     Next    
Rule Title: FLOOD PROOFING REQUIREMENTS FOR PLUMBING SYSTEMS
Add to My Favorites
Add to Favorites
Department: NATURAL RESOURCES AND CONSERVATION, DEPARTMENT OF
Chapter: FLOODPLAIN MANAGEMENT
Subchapter: Flood Proofing Requirements
 
Latest version of the adopted rule presented in Administrative Rules of Montana (ARM):

Printer Friendly Version

36.15.903    FLOOD PROOFING REQUIREMENTS FOR PLUMBING SYSTEMS

(1) Plumbing systems for allowed and permitted floodplain and floodway uses shall conform to the following conditions:

(a) Sewer lines, except those to buried and sealed

vaults, must have check valves installed to prevent sewage backup into permitted structures; and

(b) All toilet stools, sinks, urinals, and drains must be located such that the lowest point of possible water entry is at least 2 feet above the elevation of the base flood.

History: Sec. 76-5-208, MCA; IMP, Sec. 76-5-401 through 76-5-402, and Sec. 76-5-404 through 76-5-406, MCA; NEW, Eff. 9/4/74; AMD, 1989 MAR p. 1665, Eff. 10/27/89.


 

 
MAR Notices Effective From Effective To History Notes
10/27/1989 Current History: Sec. 76-5-208, MCA; IMP, Sec. 76-5-401 through 76-5-402, and Sec. 76-5-404 through 76-5-406, MCA; NEW, Eff. 9/4/74; AMD, 1989 MAR p. 1665, Eff. 10/27/89.
Home  |   Search  |   About Us  |   Contact Us  |   Help  |   Disclaimer  |   Privacy & Security