36.25.237    REPORT UPON TERMINATION OF SEISMOGRAPHIC PERMIT

(1) Within 6 months after termination of a permit, the permittee shall submit to the department an affidavit setting forth the following:

(a) the nature of the tests conducted;

(b) a narrative description of or a map showing the number and location of sites where tests were conducted; and

(c) the location and depth of any geologic formations which may be capable of producing water in usable quantities that are discovered in testing. The submission of a driller's log shall satisfy this requirement.

(2) The permittee shall maintain records (including receipts and/or check or draft numbers) of amounts paid, if any, to surface owners or lessees in settlement of damages. The permittee shall make the records available for the department's review upon requests of the department.

History: 77-3-402, MCA; IMP, 77-3-401, MCA; NEW, 1980 MAR p. 3122, Eff. 12/27/80; TRANS, 1996 MAR p. 2384.