17.50.1109 RUN-ON AND RUN-OFF CONTROL SYSTEMS (1) The owner or operator of a Class II landfill unit shall design, construct, and maintain: (a) a run-on control system to prevent flow onto the active portion of the landfill during the peak discharge from a 25-year storm; and (b) a run-off control system from the active portion of the landfill to collect and control at least the water volume resulting from a 24-hour, 25-year storm. (2) Run-off from the active portion of the landfill unit must be handled in accordance with 17.50.1110(1). History: 75-10-204, MCA; IMP, 75-10-204, MCA; NEW, 2010 MAR p. 317, Eff. 2/12/10. |