17.35.108 CONSTRUCTION (1) All discharge from a vessel pumpout facility should be directed to a holding tank meeting the requirements of this chapter with removal and disposal by a licensed septic hauler as defined in ARM Title 17, chapter 50, subchapter 8. (2) All collection systems should meet the requirements of Department Circular DEQ-4, Subchapter 4.1, unless modified by this chapter. History: 23-2-522, MCA; IMP, 23-2-522, MCA; NEW, 2015 MAR p. 1388, Eff. 9/11/15. |