Rule Title: ELECTRIC TRANSMISSION LINES, RELIABILITY OF SERVICE
Add to My Favorites
Add to Favorites
Department: ENVIRONMENTAL QUALITY, DEPARTMENT OF
Chapter: MAJOR FACILITY SITING
Subchapter: Application Requirements for Service Area Utilities Explanation of Need for Generation, Conversion and Linear Facilities
 
Latest version of the adopted rule presented in Administrative Rules of Montana (ARM):

Printer Friendly Version

17.20.923    ELECTRIC TRANSMISSION LINES, RELIABILITY OF SERVICE

(1) For electric transmission lines where reliability of service is a basis of need, an application must contain the following:

(a) the information required by ARM 17.20.922(5) and (6) ;

(b) a description of the planning assumptions and rules by which the applicant attempts to maintain its desired level of generation and transmission reliability, and an explanation of the rationale for the selection of the desired level of reliability. To the extent this information has been provided in ARM 17.20.907, it need not be duplicated here.

(c) to the extent available 10 years historical line outage data in the area to be served by the proposed facility including the duration, location, and cause of the outage, the load lost, and the number and type of customers affected, if known.

History: 75-20-105, MCA; IMP, 75-20-211, MCA; NEW, 1984 MAR p. 1844, Eff. 12/28/84; TRANS, from DNRC, 1996 MAR p. 2863; AMD, 2005 MAR p. 252, Eff. 2/11/05.


 

 
MAR Notices Effective From Effective To History Notes
2/11/2005 Current History: 75-20-105, MCA; IMP, 75-20-211, MCA; NEW, 1984 MAR p. 1844, Eff. 12/28/84; TRANS, from DNRC, 1996 MAR p. 2863; AMD, 2005 MAR p. 252, Eff. 2/11/05.