17.24.1011 HYDROLOGIC BALANCE
(1) Prospecting must be conducted to minimize disturbance of the prevailing
hydrologic balance in accordance with ARM 17.24.631 through 17.24.634,
17.24.638 through 17.24.651 and must include appropriate sediment control
measures, such as those listed in ARM 17.24.638 or sedimentation ponds that
comply with the requirements of ARM 17.24.639.
The department may specify additional measures.
History: 82-4-205, MCA; IMP, 82-4-226, 82-4-231, 82-4-232, 82-4-233, MCA; NEW, 1980 MAR p. 725, Eff. 4/1/80; AMD, 1989 MAR p. 30, Eff. 1/13/89; AMD, 1995 MAR p. 31, Eff. 1/13/95; TRANS, from DSL, 1996 MAR p. 3042; AMD, 2024 MAR p. 258, Eff. 2/10/24.