HOME    SEARCH    ABOUT US    CONTACT US    HELP   
           
Rule: 17.8.1604 Prev     Up     Next    
Rule Title: INSPECTION AND REPAIR REQUIREMENTS
Add to My Favorites
Add to Favorites
Department: ENVIRONMENTAL QUALITY, DEPARTMENT OF
Chapter: AIR QUALITY
Subchapter: Emission Control Requirements for Oil and Gas Well Facilities Operating Prior to Issuance of a Montana Air Quality Permit
 
Latest version of the adopted rule presented in Administrative Rules of Montana (ARM):

Printer Friendly Version

17.8.1604    INSPECTION AND REPAIR REQUIREMENTS

(1) The owner or operator of an oil and gas well facility shall inspect all VOC piping components for leaks each calendar month. Leak detection methods may incorporate the use of sight, sound, or smell.

(2) The owner or operator shall make the first attempt to repair any leaking VOC equipment within five days after the leak is detected.

(3) Any leaking VOC equipment must be repaired as soon as practicable, but no later than 15 days after the leak is initially detected, unless the repair is technically infeasible without a facility shutdown. Such equipment shall be repaired before the end of the first facility shutdown after the leak is initially detected.

History: 75-2-111, 75-2-211, MCA; IMP, 75-2-211, MCA; NEW, 2005 MAR p. 2660, Eff. 1/1/06.


 

 
MAR Notices Effective From Effective To History Notes
1/1/2006 Current History: 75-2-111, 75-2-211, MCA; IMP, 75-2-211, MCA; NEW, 2005 MAR p. 2660, Eff. 1/1/06.
Home  |   Search  |   About Us  |   Contact Us  |   Help  |   Disclaimer  |   Privacy & Security