17.8.823 SOURCE INFORMATION
(1) The owner or operator of a proposed source or modification shall submit the permit application fee required pursuant to ARM 17.8.504 and all information necessary to perform any analysis or make any determination required under procedures established in accordance with this subchapter.
(2) Such information shall include the following:
(a) a description of the nature, location, design capacity, and typical operating schedule of the source or modification, including specifications and drawings showing its design and plant layout;
(b) a detailed schedule for construction of the source or modification; and
(c) a detailed description as to what system of continuous emission reduction is planned by the source or modification, emission estimates, and any other information as necessary to determine that BACT as applicable would be applied.
(3) Upon request of the department, the owner or operator shall also provide information regarding the following:
(a) the air quality impact of the source or modification, including meteorological and topographical data necessary to estimate such impact; and
(b) the air quality impacts and the nature and extent of any or all general commercial, residential, industrial, and other growth which has occurred since August 7, 1977, in the area the source or modification would affect.
History: 75-2-111, 75-2-203, MCA; IMP, 75-2-202, 75-2-203, 75-2-204, MCA; NEW, 1993 MAR p. 2919, Eff. 12/10/93; TRANS, from DHES, 1996 MAR p. 2285.