HOME    SEARCH    ABOUT US    CONTACT US    HELP   
           
Prev Next

36.21.637    PROTECTION OF SITE

(1) The contractor shall remove from the site all unused materials. Water pumped from the well shall be conducted to a place where it will be possible to dispose of the water without damage to property or the creation of a nuisance.

(2) Cleanup and restoration of site should be covered by a drilling agreement.

(3) The well shall be protected by the contractor from pollution during construction.

History: 37-43-202(3), MCA; IMP, 37-43-202(3), MCA; NEW, 1986 MAR p. 1699, Eff. 10/17/86; AMD, 1997 MAR p. 65, Eff. 1/17/97.

Home  |   Search  |   About Us  |   Contact Us  |   Help  |   Disclaimer  |   Privacy & Security