HOME    SEARCH    ABOUT US    CONTACT US    HELP   
           
Prev Next

36.22.1201    SURFACE EQUIPMENT

Wellhead equipment shall be installed and maintained in satisfactory condition so that static bottom-hole pressures and operating gas-oil ratios may be obtained at any time. Valves shall be installed so that pressures can be readily obtained on both casing and tubing. However, exceptions may be granted by the petroleum engineer or his authorized agent when warranted by operating practices.

History: 82-11-111, MCA; IMP, 82-11-123, 82-11-124, MCA; Eff. 12/31/72.

Home  |   Search  |   About Us  |   Contact Us  |   Help  |   Disclaimer  |   Privacy & Security