HOME    SEARCH    ABOUT US    CONTACT US    HELP   
           
Prev Next

17.50.1109    RUN-ON AND RUN-OFF CONTROL SYSTEMS

(1) The owner or operator of a Class II landfill unit shall design, construct, and maintain:

(a) a run-on control system to prevent flow onto the active portion of the landfill during the peak discharge from a 25-year storm; and

(b) a run-off control system from the active portion of the landfill to collect and control at least the water volume resulting from a 24-hour, 25-year storm.

(2) Run-off from the active portion of the landfill unit must be handled in accordance with 17.50.1110(1).

History: 75-10-204, MCA; IMP, 75-10-204, MCA; NEW, 2010 MAR p. 317, Eff. 2/12/10.

Home  |   Search  |   About Us  |   Contact Us  |   Help  |   Disclaimer  |   Privacy & Security