(1) An application for an energy generation or
conversion facility must contain an engineering description of the facility in
detail sufficient to enable the department to assess the environmental impacts
of construction, operation, maintenance, and decommissioning, and to assess reliability
and construction and operation costs of the proposed facility at the proposed
site as specified in ARM 17.20.1502 through 17.20.1505. These requirements apply specifically to
fossil-fueled facilities and other facilities that utilize transportable
energy resources. An equivalent description and design is required for all
energy generation or conversion facilities defined by 75-20-104(8),
MCA. Applicants for energy generation or conversion facilities that employ a nontransportable energy resource must
consult with the department concerning facility description and design
requirements.