(1) Abandoned borings, water supply wells and monitoring wells shall be
completely sealed with grout or bentonite in order to prevent future
contamination of ground water. The
sealing materials used shall be continuous, physically and chemically stable,
and have a hydraulic conductivity of less than 1 x 10-5 cm/sec.
(2) All boreholes not completed as a monitoring
well, piezometer, or water supply well must be abandoned immediately after
drilling and completion of soil testing.
(3) If any borehole is deeper than the well to be
placed in it, the portions of the borehole below the well screen shall be
sealed with bentonite pellets or a bentonite slurry.
(4) All abandonment activities must be carried out
in compliance with ARM 36.21.670 through 36.21.678 and ARM 36.21.810.