HOME    SEARCH    ABOUT US    CONTACT US    HELP   
           
This is an obsolete version of the rule. Please click on the rule number to view the current version.

17.36.802    FEE SCHEDULES

(1) An applicant for approval of a division of land into one or more parcels, condominiums, mobile home/trailer courts, recreational camping vehicle spaces, and tourist campgrounds shall pay the following fees:
  UNIT UNIT COST
  TYPE OF LOTS    
  Subdivision lot lot/parcel $ 100
Condominium/trailer court/recreational
camping vehicle campground
unit/space $ 40
Resubmittal fee – previously approved lot,
boundaries are not changed
lot/parcel $ 60
 TYPE OF WATER SYSTEM    
  Individual or shared water supply system
(existing and proposed)
  unit $ 60

Multiple user system
- new system 

 

 

- connection to approved
   existing distribution
   system
- extension to existing
   distribution system
- new distribution system


each

 

 

 

lot/unit

   
lot/unit  

lot/unit


$250 (plus $75/
hour for review
in excess of four hours)  



$ 20   


$ 50 

$ 50

Public water system
   New system per DEQ-1

     
- connection to existing system
- extension of existing system
- new distribution system


component


lot/structure
lot/structure
lot/structure


per ARM
17.38.106 fee schedule 

$ 20
$ 40
$ 40

TYPE OF WASTEWATER DISPOSAL    
Existing systems unit $ 60
New subsurface system drainfield $ 75
New pressure-dosed, elevated sand mound,
ET systems, intermittent sand filter, ETA
systems, recirculating sand filter,
recirculating trickling filter, aerobic treatment
unit, nutrient removal, and whole house
subsurface drip irrigation systems
design           $150 (plus $75/
hour for review
in excess of two hours)  
Drainfields for pressured-dosed, intermittent
sand filter, recirculating sand filter,
recirculating trickling filter, aerobic treatment
unit, and nutrient removal
drainfield $ 40

      UNIT   UNIT COST
Gray water reuse systems. This is a stand-
alone fee and all gray water reuse systems
will be reviewed at the unit cost
unit $75 (plus $75/hour in excess of two hours)
Multiple user wastewater system
- connection
- extension
- new collection system
lot/unit
lot/unit
lot/unit
$ 20
$ 50
$ 50

New public wastewater system per DEQ-2


- New connection to existing
   system
- New extension to existing
   public wastewater system
- New public wastewater
   collection system

component  


lot/structure 

lot/structure

lot/structure

per ARM
17.38.106 fee
schedule 

$ 20 

$ 50 

$ 50

  OTHER        
  Deviation from circular   request or per design   $150 (plus $75/
hour for review
in excess of two
hours)
Waiver from rule request $150 (plus $75/
hour for review
in excess of two
hours)
Reissuance of original approval statement request $ 50
Municipal facilities exemption checklist
(former master plan exemption)
application $ 100
      UNIT   UNIT COST

Nonsignificance determinations/categorical
exemption reviews
- individual/shared systems 

- multiple-user and public systems

 

drainfield

lot/structure

   

$ 50

$ 25

Storm drainage plan review 

- plans exempt from Circular DEQ-8

- Circular DEQ-8 review    

  

lot 

lot

 

$ 30

$30 (plus $75/
hour for review
in excess of 30
minutes per lot)

Preparation of environmental
assessments/environmental
impact statements
---- actual cost

History: 76-4-105, MCA; IMP, 76-4-105, 76-4-128, MCA; NEW, EMERG, Eff. 5/15/75; NEW, Eff. 9/5/75; AMD, Eff. 5/6/76; AMD, EMERG, 1977 MAR p. 536, Eff. 9/6/77; AMD, 1977 MAR p. 750, Eff. 10/25/77; AMD, 1980 MAR p. 2967, Eff. 11/29/80; AMD, 1981 MAR p. 1288, Eff. 10/30/81; AMD, 1983 MAR p. 851, Eff. 7/15/83; AMD, 1984 MAR p. 1027, Eff. 7/13/84; AMD, 1992 MAR p. 2145, Eff. 9/25/92; AMD, 1993 MAR p. 542, Eff. 4/16/93; TRANS, from DHES, 1996 MAR p. 1499; AMD, 1998 MAR p. 646, Eff. 3/13/98; AMD, 2002 MAR p. 1465, Eff. 5/17/02; AMD, 2009 MAR p. 2477, Eff. 12/25/09.

Home  |   Search  |   About Us  |   Contact Us  |   Help  |   Disclaimer  |   Privacy & Security