(1) The purpose of this rule is to establish fee schedules to be used to calculate fees to be paid to the department for review of plans and specifications for public water supply and public sewage systems, as required under Title 75, chapter 6, part 1, MCA, and ARM 17.38.101.
(2) Department review will not be initiated until fees calculated under (2)(a) through (e) and (5) have been received by the department. If applicable, the final approval will not be issued until the calculated fees under (3) and (4) have been paid in full. The total fee for the review of a set of plans and specifications is the sum of the fees for the applicable parts or subparts listed in these citations.
(a) The fee schedule for designs requiring review for compliance with Department Circular DEQ-1 is set forth in Schedule I, as follows:
SCHEDULE I
Policies
ultra violet disinfection $ 700
point-of-use/point-of-entry treatment $ 700
Section 1.0 Engineering Report $ 280
Section 3.1 Surface water
quality and quantity $ 700
structures $ 700
Section 3.2 Ground water $ 840 Section 4.1 Clarification
standard clarification $ 700
solid contact units $ 1,400
Section 4.2 Filtration
rapid rate $ 1,750
pressure filtration $ 1,400
diatomaceous earth $ 1,400
slow sand $ 1,400
direct filtration $ 1,400
biologically active filtration $ 1,400
membrane filtration $ 1,400
micro and ultra filtration $ 1,400
bag and cartridge filtration $ 420
Section 4.3 Disinfection $ 700 Section 4.4 Softening $ 700
Section 4.5 Aeration
natural draft $ 280
forced draft $ 280
spray/pressure $ 280
packed tower $ 700
Section 4.6 Iron and manganese $ 700
Section 4.7 Fluoridation $ 700
Section 4.8 Stabilization $ 420
Section 4.9 Taste and odor control $ 560
Section 4.10 Microscreening $ 280
Section 4.11 Ion exchange $ 700
Section 4.12 Adsorptive media $ 700
Chapter 5 Chemical application $ 980
Chapter 6 Pumping facilities $ 980
Section 7.1 Plant storage $ 980
Section 7.2 Hydropneumatic tanks $ 420
Section 7.3 Distribution storage $ 980
Section 7.4 Cisterns $ 420
Chapter 8 Distribution system
per lot fee $ 70
non-standard specifications $ 420
transmission distribution (per lineal foot) $ 0.25
rural distribution system (per lineal foot) $ 0.03
Chapter 9 Waste disposal $ 700
Appendix A
new systems $ 280
modifications $ 140
(b) The fee schedule for designs requiring review for compliance with Department Circular DEQ-2 is set forth in Schedule II, as follows:
SCHEDULE II
Chapter 10 Engineering reports and facility plans
engineering reports (minor).............................................................$ 280
comprehensive facility plan (major)................................................$ 1,400
Chapter 30 Design of sewers
per lot fee.........................................................................................$ 70
non-standard specifications..............................................................$ 420
collection system (per lineal foot)....................................................$ 0.25
Chapter 40 Sewage pumping station
force mains (per lineal foot).............................................................$ 0.25
1000 gpm or less..............................................................................$ 700
greater than 1000 gpm.......................................................................$ 1,400
Chapter 60 Screening grit removal
screening devices and comminutors.................................................$ 420
grit removal.....................................................................................$ 420
flow equalization.............................................................................$ 700
Chapter 70 Settling...............................................................................$ 1,120
Chapter 80 Sludge handling..................................................................$ 2,240
Chapter 90 Biological treatment...........................................................$ 3,360
nonaerated treatment ponds..............................................................$ 1,120
aerated treatment ponds....................................................................$ 1,960
Chapter 100 Disinfection.......................................................................$ 900
Chapter 120 Irrigation and Rapid Infiltration Systems...........................$ 980
Appendices A and C (per design)..........................................................$ 980
(c) The fee schedule for designs requiring review for compliance with Department Circular DEQ-3 is set forth in Schedule III, as follows:
SCHEDULE III
Section 3.2 Ground water............................................................................$ 840
Chapter 6 Pump facilities............................................................................$ 420
Chapter 7 Finished storage/hydropneumatic tanks.......................................$ 420
Chapter 8 Distribution system......................................................................$ 420
(d) The fee schedule for designs requiring review for compliance with Department Circular DEQ-4 is set forth in Schedule IV, as follows:
SCHEDULE IV
Chapter 7 Septic Tanks $ 280 Chapters 8, 10, 11, 12, 13 Absorption Trenches $ 280
Chapter 9 Dosing System $ 280
Chapter 14 Elevated Sand Mounds $ 280
Chapters 15, 16, 17 Filters $ 280
Chapters 17, 18 ETA and ET Systems $ 700
Chapter 20 Aerobic Treatment $ 700
Chapter 21 Chemical Nutrient-Reduction Systems $ 700
Chapter 24, 25, 26, 27 Holding Tanks, Pit Privy, Seepage Pits $ 280
Appendix D $ 280
Non-degradation Review $ 420
(e) The fee schedule for the review of plans and specifications not covered by a specific department design standard, but within one of the following categories, is set forth in Schedule V as follows:
SCHEDULE V
Spring box and collection lateral $ 350
(3) Fees for review of plans and specifications not covered under (2) are established by the department based on a charge of $105 per hour multiplied by the time required to review the plans and specifications. The review time applied to each set of plans and specifications will be determined by the review engineer and documented with time sheets.
(4) The fee for review of plans and specifications previously denied, for staff time over two hours, is $105 per hour, assessed in half-hour increments, multiplied by the time required to review the plans and specifications. The review time applied to each set of plans and specifications must be determined by the review engineer and documented with time sheets.
(5) The fee for review of deviations is $200 per deviation.
(6) Fee payment must be in the form of a check or money order made payable to the state of Montana, Department of Environmental Quality.
(7) When a resubmitted set of plans and specifications contains substantial changes in the design that require the plans and specifications to be reviewed again, the department may require an additional review fee. The additional fee will be calculated in the same manner as the original fee and based on those parts of the standard that must be reviewed again due to the change in design. The department shall give notice and provide for appeal as specified under 75-6-108(5), MCA.