17.24.601 |
GENERAL REQUIREMENTS FOR ROAD AND RAILROAD LOOP CONSTRUCTION |
|
2/10/2024 |
17.24.602 |
LOCATION OF ROADS AND RAILROAD LOOPS |
|
2/10/2024 |
17.24.603 |
ROAD AND RAILROAD LOOP EMBANKMENTS |
|
2/10/2024 |
17.24.604 |
SOIL REMOVAL IS REPEALED |
REP
|
4/23/1999 |
17.24.605 |
HYDROLOGIC IMPACT OF ROADS AND RAILROAD LOOPS |
|
2/10/2024 |
17.24.606 |
SURFACING OF ROADS IS REPEALED |
REP
|
4/23/1999 |
17.24.607 |
MAINTENANCE OF ROADS AND RAILROAD LOOPS |
|
2/10/2024 |
17.24.608 |
IMPACTS OF OTHER TRANSPORT FACILITIES |
|
2/10/2024 |
17.24.609 |
OTHER SUPPORT FACILITIES |
|
2/10/2024 |
17.24.610 |
PERMANENT ROADS |
|
2/10/2024 |
|
Rules 17.24.611 through 17.24.620 reserved
|
|
|
17.24.621 |
GENERAL REQUIREMENTS FOR USE OF EXPLOSIVES |
|
2/10/2024 |
17.24.622 |
PREBLASTING SURVEY |
|
2/10/2024 |
17.24.623 |
BLASTING SCHEDULE |
|
2/10/2024 |
17.24.624 |
SURFACE BLASTING REQUIREMENTS |
|
2/10/2024 |
17.24.625 |
SEISMOGRAPH MEASUREMENTS |
|
2/10/2024 |
17.24.626 |
RECORDS OF BLASTING OPERATIONS |
|
2/10/2024 |
|
Rules 17.24.627 through 17.24.630 reserved
|
|
|
17.24.631 |
GENERAL HYDROLOGY REQUIREMENTS |
|
2/10/2024 |
17.24.632 |
PERMANENT SEALING OF DRILLED HOLES |
|
2/10/2024 |
17.24.633 |
WATER QUALITY PERFORMANCE STANDARDS |
|
2/10/2024 |
17.24.634 |
RECLAMATION OF DRAINAGE BASINS |
|
2/10/2024 |
17.24.635 |
GENERAL REQUIREMENTS FOR TEMPORARY AND PERMANENT DIVERSION OF OVERLAND FLOW, THROUGH FLOW, SHALLOW GROUND WATER FLOW, EPHEMERAL DRAINAGEWAYS, AND INTERMITTENT AND PERENNIAL STREAMS |
|
2/10/2024 |
17.24.636 |
SPECIAL REQUIREMENTS FOR TEMPORARY DIVERSIONS |
|
2/10/2024 |
17.24.637 |
SPECIAL REQUIREMENTS FOR PERMANENT DIVERSIONS |
|
2/10/2024 |
17.24.638 |
SEDIMENT CONTROL MEASURES |
|
2/10/2024 |
17.24.639 |
SEDIMENTATION PONDS AND OTHER TREATMENT FACILITIES |
|
2/10/2024 |
17.24.640 |
DISCHARGE STRUCTURES |
|
2/10/2024 |
17.24.641 |
ACID- AND TOXIC-FORMING SPOILS |
|
2/10/2024 |
17.24.642 |
PERMANENT IMPOUNDMENTS AND FLOOD CONTROL IMPOUNDMENTS |
|
2/10/2024 |
17.24.643 |
GROUND WATER PROTECTION |
|
2/10/2024 |
17.24.644 |
PROTECTION OF GROUND WATER RECHARGE |
|
2/10/2024 |
17.24.645 |
GROUND WATER MONITORING |
|
2/10/2024 |
17.24.646 |
SURFACE WATER MONITORING |
|
2/10/2024 |
17.24.647 |
TRANSFER OF WELLS |
|
2/10/2024 |
17.24.648 |
WATER RIGHTS AND REPLACEMENT |
|
2/10/2024 |
17.24.649 |
DISCHARGE OF WATER INTO UNDERGROUND MINES |
|
2/10/2024 |
17.24.650 |
POSTMINING REHABILITATION OF SEDIMENTATION PONDS, DIVERSIONS, IMPOUNDMENTS, AND TREATMENT FACILITIES |
|
2/10/2024 |
17.24.651 |
STREAM CHANNEL DISTURBANCES AND BUFFER ZONES |
|
2/10/2024 |
17.24.652 |
WELLS AND UNDERGROUND OPENINGS: SAFETY |
|
2/10/2024 |