17.24.801 |
ALLUVIAL VALLEY FLOORS: PRESERVATION OF ESSENTIAL HYDROLOGIC FUNCTIONS AND PROTECTION OF FARMING |
|
2/10/2024 |
17.24.802 |
ALLUVIAL VALLEY FLOOR: PROTECTION OF FARMING AND PREVENTION OF MATERIAL DAMAGE |
|
2/10/2024 |
|
Rule 17.24.803 reserved
|
|
|
17.24.804 |
ALLUVIAL VALLEY FLOORS: MONITORING |
|
2/10/2024 |
17.24.805 |
ALLUVIAL VALLEY FLOORS: SIGNIFICANCE DETERMINATION |
|
2/10/2024 |
17.24.806 |
ALLUVIAL VALLEY FLOORS: MATERIAL DAMAGE DETERMINATION |
|
2/10/2024 |
|
Rules 17.24.807 through 17.24.810 reserved
|
|
|
17.24.811 |
PRIME FARMLAND: SOIL HANDLING |
|
2/10/2024 |
|
Rules 17.24.812 through 17.24.814 reserved
|
|
|
17.24.815 |
PRIME FARMLAND: REVEGETATION |
|
2/10/2024 |
|
Rules 17.24.816 through 17.24.820 reserved
|
|
|
17.24.821 |
ALTERNATIVE POSTMINING LAND USES: SUBMISSION OF PLAN |
|
2/10/2024 |
|
Rule 17.24.822 reserved
|
|
|
17.24.823 |
ALTERNATIVE POSTMINING LAND USES: APPROVAL OF PLAN |
|
2/10/2024 |
17.24.824 |
ALTERNATE RECLAMATION: ALTERNATE POSTMINING LAND USES IS REPEALED |
REP
|
10/22/2004 |
17.24.825 |
ALTERNATE RECLAMATION: ALTERNATE REVEGETATION IS REPEALED |
REP
|
10/22/2004 |
17.24.826 |
ALTERNATE RECLAMATION: PERIOD OF RESPONSIBILITY FOR ALTERNATE REVEGETATION IS REPEALED |
REP
|
10/22/2004 |
|
Rules 17.24.827 through 17.24.830 reserved
|
|
|
17.24.831 |
AUGER MINING: GENERAL REQUIREMENTS |
|
2/10/2024 |
17.24.832 |
AUGER MINING: SPECIFIC PERFORMANCE STANDARDS |
|
2/10/2024 |
17.24.833 |
AUGER MINING: REQUIREMENTS FOR PERMIT |
|
2/10/2024 |
17.24.834 |
REMINING: APPLICABILITY |
|
2/10/2024 |
17.24.835 |
REMINING: APPLICATION AND OPERATING REQUIREMENTS |
|
2/10/2024 |
17.24.836 |
REMINING: ELIGIBILITY FOR ABANDONED MINE LAND STATUS |
|
2/10/2024 |
17.24.837 |
REMINING: BONDING |
|
2/10/2024 |