HOME    SEARCH    ABOUT US    CONTACT US    HELP   
           
Rule: 36.21.649 Prev     Up     Next    
Rule Title: CASING CENTRALIZERS
Add to My Favorites
Add to Favorites
Department: NATURAL RESOURCES AND CONSERVATION, DEPARTMENT OF
Chapter: BOARD OF WATER WELL CONTRACTORS
Subchapter: Construction Standards
 
Latest version of the adopted rule presented in Administrative Rules of Montana (ARM):

Printer Friendly Version

36.21.649    CASING CENTRALIZERS

(1) Well casing to be sealed into an oversize drill hole should be equipped with centering guides to ensure the proper centering of a casing. In all events, casings shall be centered in the sealed interval. Guides should be of steel, at least 1/4 inch in thickness, evenly spaced in groups of 3 or 4 in 20 foot intervals or less. (See Figure 1.)

History: 37-43-202(3), MCA; IMP 37-43-202(3), MCA; NEW, 1986 MAR p. 1699, Eff. 10/17/86.


 

 
MAR Notices Effective From Effective To History Notes
10/17/1986 Current History: 37-43-202(3), MCA; IMP 37-43-202(3), MCA; NEW, 1986 MAR p. 1699, Eff. 10/17/86.
Home  |   Search  |   About Us  |   Contact Us  |   Help  |   Disclaimer  |   Privacy & Security