HOME    SEARCH    ABOUT US    CONTACT US    HELP   
           
Rule: 4.12.707 Prev     Up     Next    
Rule Title: CONTAINER APPURTENANCES
Add to My Favorites
Add to Favorites
Department: AGRICULTURE, DEPARTMENT OF
Chapter: AGRICULTURAL SCIENCES DIVISION
Subchapter: Anhydrous Ammonia Rules
 
Latest version of the adopted rule presented in Administrative Rules of Montana (ARM):

Printer Friendly Version

4.12.707    CONTAINER APPURTENANCES

(1)  All appurtenances shall be designed for not less than the maximum working pressure of that portion of the system on which they are installed. All appurtenances shall be fabricated from materials suitable for use in anhydrous ammonia service.

(2)  All connections to containers, except safety relief connections and gauging devices, shall have shutoff valves located as close to the container as practicable.

(3)  Liquid level gauging devices, which are so constructed that outward flow of container content shall not exceed that passed by a No. 54 drill size opening, need not be equipped with excess flow valves.

(4)  Container openings or through fittings (directly on container and used for pressure gauge connections)  need not be equipped with excess flow valves if such openings are protected by a vent hole not larger than a No. 54 drill size hole.

(5)  All excess flow valves shall be clearly and permanently marked with the name or trademark of the manufacturer, the catalog number, and the rated capacity.

(6)  Excess flow valves shall close automatically at the vapor or liquid rated flows as specified by the manufacturer. The connections and line, including appurtenances being protected by an excess flow valve, shall have a greater capacity than the rated flow of the excess flow valve so the valve will close in case of failure at any point in the line or fittings.

(7)  Excess flow and back pressure check valves shall be located inside the container or at a point outside where the line enters the container. In the latter case, installation shall be made in such a manner that any undue strain, beyond the excess flow or back pressure check valve, will not cause breakage between the container and the excess flow valve.

(8)  Excess flow valves shall be designed with a by-pass, not to exceed a No. 60 drill size opening, to allow equalization of pressure.

History: Sec. 80-10-503, MCA; IMP, Sec. 80-10-503, MCA; NEW, 1986 MAR p. 1820, Eff. 10/31/86.


 

 
MAR Notices Effective From Effective To History Notes
10/31/1986 Current History: Sec. 80-10-503, MCA; IMP, Sec. 80-10-503, MCA; NEW, 1986 MAR p. 1820, Eff. 10/31/86.
Home  |   Search  |   About Us  |   Contact Us  |   Help  |   Disclaimer  |   Privacy & Security