Montana Administrative Register Notice 17-405 No. 3   02/14/2020    
Prev Next

                          BEFORE THE BOARD OF ENVIRONMENTAL REVIEW

                       AND THE DEPARTMENT OF ENVIRONMENTAL QUALITY

                                             OF THE STATE OF MONTANA

 

In the matter of the amendment of ARM 17.36.802 and 17.38.106 pertaining to subdivision and public water and wastewater review fees, and New Rule I pertaining to certification under 76-4-127, MCA

)

)

)

)

)

)

NOTICE OF AMENDMENT AND ADOPTION

 

(SUBDIVISIONS)

(PUBLIC WATER AND SEWAGE SYSTEM REQUIREMENTS)

 

            TO: All Concerned Persons

 

 1. On August 23, 2019, the Board of Environmental Review (board) and Department of Environmental Quality (department) published MAR Notice No. 17-405, pertaining to the public hearing on the proposed amendment and adoption of the above-stated rules at page 1228 of the 2019 Montana Administrative Register, Issue No. 16.

 

            2. The board has amended ARM 17.38.106 as proposed but with the following changes from the original proposal, stricken matter interlined and new matter underlined:

 


            17.38.106  FEES  (1) remains as proposed.

            (2)  Department review will not be initiated until fees calculated under (2)(a) through (f) and (5) have been received by the department.  If applicable, the final approval will not be issued until the calculated fees under (3) and (4) have been paid in full.  The total fee for the review of a set of plans and specifications is the sum of the fees for the applicable parts or subparts listed in these subsections:

            (a) The fee schedule for designs requiring review for compliance with Department Circular DEQ-1 is set forth in Schedule I, as follows:

 


                                                              SCHEDULE I

           Policies

                       ultra violet disinfection                                          $ 1,000 875

                       point-of-use/point-of-entry treatment                  $ 1,000 875

           Section 1.0 Engineering Report                                        $ 400 350

           Section 3.1 Surface water

                       quality and quantity                                               $ 1,000 875

                       structures                                                                 $ 1,000 875

           Section 3.2 Ground water                                                  $ 1,200 1,050

           Section 4.1 Microscreening                                               $ 400 350

           Section 4.2 Clarification

                       standard clarification                                             $ 1,000 875

                       solid contact units                                                  $ 2,000 1,750

           Section 4.3 Filtration

                       rapid rate                                                                  $ 2,500 2,190

                       pressure filtration                                                   $ 2,000 1,750

                       diatomaceous earth                                               $ 2,000 1,750

                       slow sand                                                                $ 2,000 1,750

                       direct filtration                                                         $ 2,000 1,750

                       biologically active filtration                                                $ 2,000 1,750

                       membrane filtration                                                            $ 2,000 1,750

                       micro and ultra filtration                                        $ 2,000 1,750

                       bag and cartridge filtration                                                $ 600 520

           Section 4.4 Disinfection                                                     $ 1,000 875

           Section 4.5 Softening                                                         $ 1,000 875

           Section 4.6 Ion Exchange                                                 $ 1,000 875

           Section 4.7 Aeration

                       natural draft                                                             $ 400 350

                       forced draft                                                              $ 400 350

                       spray/pressure                                                        $ 400 350

                       packed tower                                                           $ 1,000 875

           Section 4.8 Iron and manganese                                     $ 1,000 875

           Section 4.9 Fluoridation                                                     $ 1,000 875

           Section 4.10 Stabilization                                                  $ 600 520

           Section 4.11 Taste and odor control                                $ 800 700

           Section 4.12 Adsorptive media                                         $ 1,000 875

Chapter 5 Chemical application                                        $ 1,400 1,220

           Chapter 6 Pumping facilities                                             $ 1,400 1,220

           Section 7.1 Plant storage                                                   $ 1,400 1,220

           Section 7.2 Hydropneumatic tanks                                  $ 600 520

           Section 7.3 Distribution storage                                        $ 1,400 1,220

Chapter 8 Distribution system

                       per lot fee                                                                $ 100 90

                       non-standard specifications                                 $ 600 520

                       transmission distribution (per lineal foot)           $ 0.35 0.30

                       rural distribution system (per lineal foot)            $ 0.04

                       sliplining existing mains (per lineal foot)            $ 0.20

           Chapter 9 Waste disposal                                                  $ 1,000 875

           Appendix A

                       new systems                                                           $ 400 350

                       modifications                                                          $ 200 175

 

           (b) The fee schedule for designs requiring review for compliance with Department Circular DEQ-2 is set forth in Schedule II, as follows:

 

                                                               SCHEDULE II

 

            Chapter 10 Engineering reports and facility plans

                        engineering reports (minor)                                    $ 400 350

                        comprehensive facility plan (major)                      $ 2,000 1,750

            Chapter 30 Design of sewers

                        per lot fee                                                                  $ 100 90

                        non-standard specifications                                  $ 600 520

                        collection system (per lineal foot)                          $ 0.35 0.30

                        sliplining existing mains (per lineal foot)              $ 0.20

            Chapter 40 Sewage pumping station

                        force mains (per lineal foot)                                   $ 0.35 0.30

                        1000 gpm or less                                                    $ 1,000 875

                        greater than 1000 gpm                                            $ 2,000 1,750

            Chapter 60 Screening grit removal

                        screening devices and comminutors                   $ 600 520

                        grit removal                                                               $ 600 520

                        flow equalization                                                      $ 1,000 875

            Chapter 70 Settling                                                             $ 1,500 1,400

            Chapter 80 Sludge handling                                              $ 3,000 2,800

            Chapter 90 Biological treatment                                        $ 4,700 4,200

                        nonaerated treatment ponds                                 $ 1,500 1,400

                        aerated treatment ponds                                        $ 2,800 2,450

            Chapter 100 Disinfection                                                   $ 1,200 1,120

            Chapter 120 Irrigation and Rapid Infiltration Systems   $ 1,400 1,220

            Appendices A and C (per design)                                     $ 1,400 1,220

 

            (c) The fee schedule for designs requiring review for compliance with Department Circular DEQ-3 is set forth in Schedule III, as follows:

 

                                                              SCHEDULE III

 

Section 3.2 Ground water                                                               $ 1,200 1,050

Chapter 6 Pump facilities                                                               $ 600 520

Chapter 7 Finished storage/hydropneumatic tanks                   $ 600 520

Chapter 8 Distribution system                                                       $ 600 520

 

            (d) The fee schedule for designs requiring review for compliance with Department Circular DEQ-4 is set forth in Schedule IV, as follows:

 

                                                             SCHEDULE IV

 

           Chapter 4 Pressure Dosing                                               $ 400 350

           Chapter 5 Septic Tanks                                                      $ 400 350

           Chapter 6 Soil Absorption Systems                                  $ 400 350

           Chapter 6, Subchapter 6.8 ETA and ET Systems         $ 1,000 875

           Chapter 7, Subchapters 7.1, 7.2, and 7.3 Filters           $ 400 350

           Chapter 7, Subchapter 7.4 Aerobic Treatment               $ 1,000 875

           Chapter 7, Subchapter 7.5 Chemical

Nutrient-Reduction Systems                                              $ 1,000 875

           Chapter 7, Subchapter 7.6 Alternate Advanced

Treatment Systems                                                             $ 1,000 875

           Chapter 8 Holding Tanks, Pit Privy, Seepage Pits,

Waste Segregation, Experimental Systems                    $ 400 350

           Appendix D                                                                           $ 400 350

           Non-degradation Review                                                   $ 600 520

 

           (e) The fee schedule for designs requiring review for compliance with Department Circular DEQ-10 is set forth in Schedule V as follows:

 

                                                             SCHEDULE V

           Spring box and collection lateral                                       $ 500 440

 

           (f) The fee schedule for designs requiring review for compliance with Department Circular DEQ-16 is set forth in Schedule VI, as follows:

 

                                                             SCHEDULE VI

           Cisterns                                                                                 $ 600 520

 

(3) through (7) remain as proposed.

 

            3. The department has amended ARM 17.36.802 and adopted New Rule I (ARM 17.36.610) as proposed but with the following changes from the original proposal, stricken matter interlined and new matter underlined:

 

            17.36.802 FEE SCHEDULES (1) An applicant for approval under this subchapter shall pay the following fees:

            (a) type of lots:

            (i) subdivision lot or parcel or townhouse                                   $ 175 160

            (ii) condominium/trailer court/recreational camping vehicle

campground unit or space                                                                          $ 70 60

            (iii) resubmittal fee - previously approved lot, boundaries are not changed per

lot or parcel                                                                                                   $ 100 90

            (b) type of water system:

            (i) individual or shared water supply system (existing and proposed) per

unit                                                                                                                 $ 120 110

            (ii) multiple-user system (non-public):

            (A) - each new system                                                                   $ 440 400

                                                                        (plus $ 150 130 /

                                                                        hour for

                                                                                                                        review in excess

                                                                                                                        of four hours)

            (B) - new distribution system design per lineal foot                  $ 0.50 0.30

            (C) - connection to distribution system per lot or unit               $ 100 90

            (iii) public water system:

            (A)  new system per component                                                   per ARM

                                                                                                                        17.38.106 fee

                                                                                                                        schedule

            (c) type of wastewater disposal:

            (i) existing systems per unit                                                          $ 105 90

            (ii) new gravity fed system per drainfield                                    $ 130 120

            (iii) new dosed system, elevated sand mound, ET systems, intermittent sand

filter, ETA systems, recirculating sand filter, recirculating trickling filter, aerobic treatment unit, nutrient removal, and whole house subsurface drip irrigation systems:

                (A) per design                                                                                 $ 250 240

                                                                                                                        (plus $ 150 130 /

                                                                                                                        hour for review

                                                                                                                        in excess of two

                                                                                                                        hours)

            (B) per drainfield                                                                             $ 70 60

            (iv) gray water reuse systems, holding tanks, sealed pit privies, unsealed pit

privies, seepage pits, waste segregation, experimental systems        $ 130 120

                                                                                                                        (plus $ 150 130 /

                                                                                                                        hour in excess

                                                                                                                        of two hours)

            (v) multiple-user wastewater system (non-public):

            (A) - new collection system design per lineal foot                     $ 0.35 0.30

            (B) - connection to collection system per lot or unit                  $ 100 90

            (vi) new public wastewater system per component                  per ARM

                                                                                                                        17.38.106 fee

                                                                                                                        schedule

            (d) other:

            (i)  deviation from circular per request or design                                    $ 300 250

                                                                                                                        (plus $ 150 130 /

                                                                                                                        hour for review

                                                                                                                        in excess of two

                                                                                                                        hours)

            (ii) waiver from rule per request                                                   $ 300 250

                                                                                                                        (plus $ 150 130 /

                                                                                                                        hour for review

                                                                                                                        in excess of two

                                                                                                                        hours)

            (iii) reissuance of original approval statement per request      $ 90 70

            (iv) review of revised lot layout document per request             $ 175 160

 (v) municipal facilities exemption checklist (former master

      plan exemption) per application                                              $ 150 120

            (vi) nonsignificance determinations/categorical exemption reviews:

            (A) - individual/shared systems per drainfield                           $ 90 70

                                                                                                                        (plus $ 150 130 /

                                                                                                                        hour for review

                                                                                                                        in excess of two

                                                                                                                        hours)

            (B) - multiple-user non-public systems per lot or structure      $ 45 40

                                                                                                                        (plus $ 150 130 /

                                                                                                                        hour for review

                                                                                                                        in excess of two

                                                                                                                        hours)

            (C) - source specific mixing zone per drainfield                        $ 275 250

            (D) - public systems per drainfield                                               per ARM 17.38.106 fee schedule

            (vii) storm drainage plan review:

            (A) - Circular DEQ-8 simple plan review per project                 $ 150 130

            (B) - Circular DEQ-8 standard plan review:

            (I) per project                                                                                   $ 250 220

            (II) plus per lot                                                                                 $ 60 50

                                                                                                (plus $ 150 130 /

                                                                                                hour for review

                                                                                                in excess of 30

                                                                                                minutes per lot)

            (viii) preparation of environmental assessments/environmental impact

statements:                                                                                                    actual cost

            (ix) review for compliance with ARM 17.30.718                        $ 900 (plus $150 130 / hour for review in excess of 6 hours).


 

NEW RULE I (17.36.610) CERTIFYING AUTHORITY UNDER 76-4-127, MCA (1) through (1)(b) remain as proposed.

(c)  is within a jurisdictional area covered by a growth policy pursuant to Title 76, chapter 1, MCA;

(d) through (2) remain as proposed.

 

            4. The following comments were received and appear with the board and department's response:

 

            COMMENT NO. 1:  One commenter stated it supports the department's proposal to raise subdivision review fees in ARM 17.36.802. The commenter explained that it is a county contract subdivision reviewer and recognized that the current fees do not cover the cost of review.

            RESPONSE:  The department appreciates the comment.

 

            COMMENT NO. 2: One commenter requested that the department eliminate the subdivision hourly rate fees in ARM 17.36.802 instead of increasing the fees as proposed. The commenter stated that the fee schedule already accounted for the complexity of subdivisions and that the hourly rate disincentivizes efficiencies within the department and unjustly places an undefinable and potentially unlimited cost on applicants. The commenter noted that ARM 17.36.805 already allows the department to assess fees if there are any changes to an application due to comments of deficiency or changes in project scope.

            RESPONSEThe purpose of the hourly rate is for the department to recover review costs when extremely complex or poorly prepared submittals are received. This hourly fee is assessed very rarely. In FY19, the department charged the hourly rate for two out of approximately 500 files reviewed by the department. The department can assess fees under ARM 17.36.805 only if there are changes to the reviewed facilities. In some cases, the proposed facilities do not change, so this fee cannot be assessed for every file.

 

            COMMENT NO. 3One commenter noted that the proposed fees for new water distribution systems differed between ARM 17.36.802 and 17.38.106. The commenter suggested that the department correct this discrepancy and change the fee in ARM 17.36.802 to 35 cents per lineal foot, rather than the proposed 50 cents.

            RESPONSEThe department agrees with this comment and has changed the subdivision distribution fee in ARM 17.36.802 to 35 cents per lineal foot.

 

            COMMENT NO. 4: Two commenters stated the proposed fee increase must be accompanied with a commitment from the department to improve service. One commenter stated that it is unfair for the department to ask the regulated community for a 40 percent fee increase and in return provide no more than the current level of service. The other commenter stated that the proposed fee increases should include a guarantee of timely and accurate review, not just the same level of service at an increased price.

            RESPONSE: The department is committed to improving customer service irrespective of the fee increase. For instance, the department is undertaking a comprehensive rule update to clarify and consolidate rules and standards. As described in the statement of reasonable necessity, the operating costs of the department's public water and subdivision review section have exceeded current revenue, and it is necessary to increase fees to maintain program solvency.  The department and board are adopting an approximate 25 percent fee increase in response to comments, as described in the response to Comment No. 5.  This lower fee increase does not allow for the hiring of additional staff, but is sufficient to address immediate budget shortfalls to maintain adequate staff to conduct timely and accurate reviews.

 

            COMMENT NO. 5: Two commenters suggested that the increased fees be phased in over time, rather than being adopted all at once. One of these commenters stated that the proposed fee increase would have an unavoidable impact on housing costs. The commenter also noted that the fees should be implemented gradually over a period of years because the increases are meant to cover the department's increased costs over time. The other commenter also stated that the proposed fee increase would contribute to growing unaffordability for home buyers. The commenter suggested that the fees be incrementally phased in, stating that incremental fee increases are more affordable for the regulated community and consumers to bear than an immediate 40 percent increase.

            RESPONSE: The department and board agree that a phased-in approach would create less of a burden on the regulated community and consumers.  To implement the phased-in approach suggested by the commenters, the department and board are adopting an approximate 25 percent fee increase to address immediate budget shortfalls, with the anticipation of proposing additional fee increases, as necessary, to cover future costs.  The cumulative impact of the modified fee increase would be approximately 15 percent less than the impacts of the 40 percent increase that was originally proposed.

 

            COMMENT NO. 6One commenter stated they understand the rationale for charging the subdivision per lot fee for townhomes but will closely scrutinize any future rule proposals to conflate townhomes with subdivision lots.

            RESPONSE: The department appreciates the comment.

 

            COMMENT NO. 7One commenter stated that individual permittees should not bear the entire cost of subdivision review because subdivision review benefits the public in general. The commenter noted that this is a policy decision outside the scope of this rulemaking.

            RESPONSE: The commenter's suggestion is outside the scope of this rulemaking, but the department appreciates the comment.

 

            COMMENT NO. 8One commenter objected to the statement in the statement of reasonable necessity that the department had consulted with a broad representation of stakeholders and had received no negative feedback. The commenter stated that it had expressed hesitation at the fee increases and had repeatedly stated that the organization and its members would like to review the actual proposal in detail rather than give a blanket approval to concepts introduced at informal meetings. The commenter stated that informal meetings are not a substitute for the formal process of rulemaking and that statements of the regulated community's opinion of proposed rules is an attempt to circumvent the rulemaking process and short-circuit public input.

            RESPONSE: The department thanks the commenter for the comment. The department consulted with stakeholders to vet general concepts and build consensus before publishing the rule notice for the proposed rules. The statement to which the commenter objected is the department's impression of those discussions and was included to explain the particular approach taken in the rule notice. As discussed in response to Comment No. 5, the department and board have modified the proposed rules in response to the regulated community's comments.

 

COMMENT NO. 9: One commenter requested that the department remove the proposed requirement in New Rule I that a certifying authority be required to be within a jurisdictional area covered by a growth policy pursuant to Title 76, chapter 1, MCA. The commenter noted that some county water and sewer districts are not covered by county growth policies and that county water and sewer districts are not bound by growth policies, which are advisory in nature.

            RESPONSE: The department agrees with this comment and has eliminated this requirement from New Rule I.   Necessary planning will be accomplished by the utility master plan requirement. The department has renumbered the rule to account for this change.

 

            COMMENT NO. 10: One commenter requested that the department remove storm water from the county water and sewer district certification requirements proposed in New Rule I. The commenter stated that the ability to provide adequate water and wastewater treatment is separate from reviewing and overseeing construction plans and verifying that storm water is properly addressed. The commenter stated that the storm water requirement made it very unlikely that a county water and sewer district would become a certifying authority, and the legislative change to allow county and water sewer districts to act as certifying authorities would be of no use.

            RESPONSE: The department has not modified the proposed rule in response to this comment. The requirement to review storm water facilities is necessary to comply with 76-4-127(1) and (2)(i), MCA, both of which require the certifying authority to review and approve plans to ensure adequate storm water drainage. The statutory provision would have to be amended before the commenter's proposed change could be made.

 

            5. The effective date for the proposed rulemaking was January 1, 2020. Because the board and department did not adopt the notice of proposed rulemaking by that date, the board and department are extending the effective date to March 1, 2020, to provide additional notice to the regulated community.

 

 

Reviewed by:                                                BOARD OF ENVIRONMENTAL REVIEW

 

 

/s/ Edward Hayes                                BY: /s/ Christine Deveny                                    

EDWARD HAYES                                      CHRISTINE DEVENY

Rule Reviewer                                            Chair

 

                                                                        DEPARTMENT OF ENVIRONMENTAL

                                                                        QUALITY

 

 

                                                               BY: /s/ Shaun McGrath                                      

                                                                      SHAUN McGRATH

                                                                      Director

 

            Certified to the Secretary of State, February 4, 2020.